Sasco Projects

Upgrading a Bulk Carrier Ship Loading System to improve reliability and performance.

  • Date: 2020
  • Sasco Group: Sasco Projects
  • News Type: Ports, Loading System, SA

Bulk Carrier Ship Loading System

Due to CAPEX constraints the requirement was to upgrade a crucial but problematic multi hopper management system used for managing and controlling the loading of high volumes of corn and other products into bulk carrier ships at the Port of Durban. The upgraded system was required to be highly reliable and the processing time quick.

The solution Sasco provided was to re wire the entire system, adding in multiple process gate status relays and most crucially upgrade all the controllers to the Sasco L337 indicators.

Bulk carrier ship loading system

Contact Us

2 Blackburn Street, Apex Industrial Benoni, 1500, South Africa.

+27 11 746 6000

info@sascoafrica.com

Subscribe To Our Newsletter

Subscribe To Our Newsletter

 

Join the Sasco Africa mailing list to receive the latest news and updates from the weighing industry, as well as exclusive specials for our products and services.

You have Successfully Subscribed!